Sign In | Join Free | My burrillandco.com |
|
Ask Lasest Price | |
Brand Name : | YINDA |
Certification : | API 7K |
Model Number : | Triplex Mud Pump |
Price : | USD/CNY |
Delivery Time : | In stock |
Payment Terms : | T/T 30%DP, Balance before delivery |
Supply Ability : | In stock |
Eccentric Bearing, Mud Pump Crankshaft AH36001-02.19.00 AH37001-01.08.00 928/508 929/660.4QU 929/558.8QU
Mud pump eccentric bearing
Single row cylindrical roller bearings with cage consists of inner
ring ,outer rings ,cylindrical roller and cage . The outer rings
have rigid ribs on both sides or no ribs, the inner rings have one
or two rigid ribs or are designed without ribs. The cage prevents
cylindrical rollers from coming into contact with each other during
rolling.
The cylindrical roller bearings with cage have high rigidity, it
can withstand high radial load ,and due to the cage, this kind of
bearing are more suitable for higher speeds compared to full
complement designs. Bearings with the suffix E have a higher load
capacity through internal design optimization , and are suitable
for higher load carrying capacity working situation.
Mud Pump Parts Model We Can Do
BOMCO | F-500 | F-800 | F-1000 | F-1300 | F-1600 | F-1600HL | F-1600L | F-2200HL |
Hong Hua | HHF-500 | HHF-800 | HHF-1300 | HHF-1600 | 3NB-1600F | 5NB-1600 | 5NB-2400 | |
HRSB | RSF-1300 | RSF-1600 | ||||||
RG | RGF-800 | RGF-1000 | RGF-1300 | RGF-1600 | ||||
Lanzhou | 3NB1000C | 3NB1300C | 3NB1600F | 3NB1600L | ||||
EMSCO | F-500 | F-800 | F-1000 | F-1300 | F-1600 | FD-1000 | FC-2200 | FB-1300 |
Gardner Denver | PAH | P7 | P8/9 | P10/11 | ||||
National | 7-P-50 | 8-P-80 | 9-P-100 | 10-P-130 | 12-P-160 | 14-P-200 | 14-P-220 | |
Oilwell | A-850-PT | A-1100-PT | A-1400-PT | A-1700-PT | ||||
TSC | WF-500 | WF-800 | WF-1000 | WF-1300 | WF-1600 | WF-2000 | WF-2200 | |
IDECO | T-500 | T-800 | T-1000 | T-1300 | T-1600 | |||
RUSSIA | UNBT-1180L | UNBT-950A | UNB-600 |
FAQ
1) How can I place order?
A: You can contact us by email about your order details, or place
order on line.
2) How can I pay you?
A: After you confirm our PI, we will request you to pay. T/T is the
most usual ways we are using.
3) What's the order procedure?
A: First we discuss order details, production details. Then we
issue you an PI for your confirmation. You will be requested to do
pr-e paid full payment or deposit before we go into production.
After we get the deposit, we start to process the order. We usually
need 15-25 days if we don't have the items in stock. Before
production has been finished, we will contact you for shipment
details, and the balance payment. After payment has been settled,
we start to prepare the shipment for you.
4) How do you take care when your clients received defective
products?
A: replacement. If there are some defective items, we usually
credit to our customer or replace in next shipment.
5) How do you check all the goods in the production line?
A: We have spot inspection and finished product inspection. We
check the goods when they go into next step production procedure.
More customer view:12-TSCmudpumpparts8-yindapump.com.pdf
![]() |